Integrated scheduling and tool management in flexible manufacturing systems
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, cilt.39, sa.12, ss.2697-2722, 2001 (SCI-Expanded, Scopus)
- Yayın Türü: Makale / Tam Makale
- Cilt numarası: 39 Sayı: 12
- Basım Tarihi: 2001
- Doi Numarası: 10.1080/00207540110051941
- Dergi Adı: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
- Sayfa Sayıları: ss.2697-2722
- Açık Arşiv Koleksiyonu: AVESİS Açık Erişim Koleksiyonu
- Ankara Üniversitesi Adresli: Evet
Özet
A multistage algorithm is proposed that will solve the scheduling problem in a flexible manufacturing system by considering the interrelated subproblems of processing time control, tool allocation and machining conditions optimization. The main objective of the proposed algorithm is to minimize total production cost consisting of tooling, operational and tardiness costs. The proposed integrated approach recognizes an important trade-off in automated manufacturing systems that has been largely unrecognized, and which is believed can be effectively exploited to improve production efficiency and lead to substantial cost reductions.